Skip to content

Archive

Every entry

18 published entries. Entries whose date has not arrived are not listed.

Published entries, newest first
Published Title Section Support Layers Drying
2026-10-26 Hopper's Nighthawks: copying flat fields without going dead Copy Oil 5 缓慢堆叠,主要层次之间相隔数周
2026-10-22 Oiling out and retouching varnish: the sunk-in problem Medium Oil 4 润色光油 30 分钟定型;回油 12 小时
2026-10-19 Monet's Rouen series: painting the same thing thirty times Copy Oil 5 每幅画跨多日作业,半干状态
2026-10-15 Acrylic glazing liquids and the open-time problem Medium Acrylic 5 罩染液把开放时间延长到 20–40 分钟
2026-10-12 Sargent's Lady Agnew: how few strokes a face can take Copy Oil 5 湿画法时段,总共 2–3 次作画
2026-10-08 Sgraffito and scratch-back on acrylic grounds Method Acrylic 5 每层 30–60 分钟后可刮
2026-10-05 Alkyd mediums: faster drying without wrecking the film Medium Oil 4 约缩短 50–70 % 的干燥时间
2026-10-01 Copying late Rembrandt: impasto over a thin ground Copy Oil 5 晚年自画像可见二十次以上独立干燥期
2026-09-28 Scumbling: the dry-brush haze that unifies a picture Method Oil 4 12–18 小时后再动下一层
2026-09-24 Turpentine vs odourless mineral spirits: what the difference actually costs you Medium Oil 4 松节油 30 分钟挥发;无味矿物油 2–4 小时
2026-09-21 Wet-into-wet: finishing in one sitting Method Oil 5 单次 3–5 小时,中途不干
2026-09-18 Acrylic mediums: matte, gloss, and what they do to colour Medium Acrylic 5 20–40 分钟表干,24 小时干透
2026-09-12 Palette knife impasto that will still be there in ten years Method Oil 5 表面 2 天结皮,完全固化 6–12 个月
2026-09-06 Copying Vermeer: the glaze stack in The Milkmaid Copy Oil 6 复原层次需要 9–12 天干燥
2026-08-31 Linseed oil vs stand oil: choosing the right body Medium Oil 4 亚麻仁油 24 小时;熟油 3–4 天
2026-08-25 From grisaille underpainting to colour glaze Method Oil 5 总计 3–5 天工作日
2026-08-19 Fat over lean, explained without the folklore Method Oil 5 20 °C 下膜完全固化需 6–10 天
2026-08-14 Three-pass glazing: building depth without mud Method Oil 5 20 °C 下每层间隔 18–24 小时